Guba@Concrete Reinforcement System Guba Reinforcement System
Lanling Huanke's Guba reinforcement system combines special concrete materials with new waterproof protective materials.Based on various construction engineering fields,it collaborates with institutions such as Sun Yat-sen University and Zhengzhou University to develop comprehensive reinforcement solutions.

1.Reinforcement engineering scheme
Reinforcement and strengthening scheme by increasing section:By increasing the sectional area of components and the amount of reinforcement,the structural bearing capacity is improved.
Steel bonding reinforcement scheme:Structural adhesive is used to adhere steel plates to the surface of the structure,enhancing its structural strength and rigidity.
Carbon fiber sheet reinforcement and strengthening scheme:Utilizing the high-strength characteristics of carbon fiber sheets,they are pasted onto the surface of the structure for reinforcement.
Grouting reinforcement and strengthening scheme for structural cracks in buildings:Perform grouting treatment on structural cracks to restore the overall integrity of the structure.
Reinforcement and strengthening scheme through implanting steel bars:Drill holes in the existing structure and implant steel bars to enhance the connection between the new and old structures.
Prestressed carbon fiber plate reinforcement and strengthening scheme:Apply prestress to the carbon fiber plate to actively strengthen the structure.
Pre-tensioned steel wire mesh-polymer mortar surface layer reinforcement scheme:The pre-tensioned steel wire mesh is combined with polymer mortar to enhance the structural crack resistance.

II.Highway engineering scheme
Rapid repair plan for bridge expansion joints:Conduct rapid and effective repairs for damaged bridge expansion joints.
Repair plan for asphalt pavement potholes using cold patch material:Apply cold patch material to repair asphalt pavement potholes.
Treatment plan for asphalt pavement cracks:Perform crack filling,sealing,and other treatments on asphalt pavement cracks.
Ec pavement epoxy coating solution&asphalt pavement restoration and maintenance solution:Employ Ec epoxy coating technology for pavement protection,while implementing asphalt pavement restoration and maintenance.
Thin-layer repair scheme for concrete pavement:Conduct thin-layer repair for surface damage of concrete pavement.
Repair plan for broken slabs and missing corners of concrete pavement:Repair the broken slabs and missing corners of concrete pavement.
Rapid repair scheme for airport pavement damage:Conduct rapid and efficient repair of airport pavement damage.
Pavement high polymer grouting scheme:Using high polymer materials for pavement grouting reinforcement.
Ultra-high performance cement-based composite material solution:Apply high-performance cement-based composite materials for pavement repair and reinforcement.
ECC high ductility fiber-reinforced cement-based composite material solution:Using ECC materials to enhance the crack resistance and durability of pavements.
Bridge anti-collision barrier repair plan:Repair and reinforce the bridge anti-collision barrier.

III.Track Engineering Plan
Surface sealing scheme for cracks on track slabs:Conduct surface sealing treatment on cracks on track slabs.
Repair plan for damaged and chipped ballastless tracks:Repair damaged and chipped ballastless tracks.
Lifting scheme for ballastless track:Lift and adjust the subsided ballastless track.
Repair scheme for discrete joints in ballastless track structure:Repair the discrete joints between ballastless track structures.
Defect repair plan for shield tunnel segments:Repair and reinforce defects in shield tunnel segments.
Anticorrosion plan for railway concrete structures:Implement anticorrosion measures to protect railway concrete structures.
Remediation plan for expansion joint defects of high-speed rail track slabs:Remediate the expansion joint defects of high-speed rail track slabs.

IV.Water Conservancy Project Plan
Advanced pre-grouting scheme for hydraulic tunnels:Implement advanced pre-grouting during the construction of hydraulic tunnels to reinforce the surrounding rock.
Leakage treatment plan for hydraulic concrete structures:Conduct sealing treatment for leakage in hydraulic concrete structures.
Repair scheme for erosion and cavitation resistance of hydraulic concrete:Repair the damage caused by erosion and cavitation on hydraulic concrete.
Underwater repair and reinforcement scheme for hydraulic concrete structures:Repair and reinforce hydraulic concrete structures underwater.
Transparent protection scheme for the surface of hydraulic fair-faced concrete:Apply a transparent protective coating to the surface of hydraulic fair-faced concrete.

V.Tunnel engineering scheme
Remediation plan for tunnel leakage:Remediate the tunnel leakage issue.
Remediation plan for voids in tunnel subgrade bed:Addressing the issue of voids in the tunnel subgrade bed.
Remediation plan for filling and grouting of secondary lining of tunnel:reinforce the secondary lining of the tunnel through filling and grouting.
Reinforcement and renovation plan for secondary lining of tunnel:Reinforce the secondary lining structure of the tunnel.
Anticorrosion renovation plan for underground sewage pipelines:Conduct anticorrosion treatment on underground sewage pipelines.
Waterproof construction scheme for shield tunnel:Implement waterproof construction for shield tunnels to ensure tunnel dryness.

VI.Nuclear Power and Other Industrial Engineering Solutions
Special construction plan for secondary grouting of steam turbine:Implement secondary grouting construction for the steam turbine foundation.
Prestressed duct grouting scheme for nuclear power plant containment:grouting the prestressed ducts of the nuclear power plant containment.
Maintenance and protection plan for utility poles:Maintain and protect utility poles to ensure their stability and safety.
Reinforcement and repair plan for cooling towers in thermal power plants:Reinforce and repair the structure of cooling towers in thermal power plants.
Repair plan for the wear-resistant layer of the slag flushing ditch in steel plants:Repair the wear-resistant layer of the slag flushing ditch in steel plants.
Equipment installation foundation plate bedding mortar plan:Implement the construction of equipment installation foundation plate bedding mortar.

VII.Civil Construction Engineering Plan
Rebar sleeve connection scheme:Rebar sleeves are used for rebar connection.
Seepage prevention and leakage control plan for underground engineering:Implement seepage prevention and leakage control measures for underground engineering.
Waterproofing and Leakage Prevention Plan for Elevator Shafts:Conduct waterproofing and leakage prevention treatment for elevator shafts.
Waterproofing and leakage prevention scheme for deformation joints:Carry out waterproofing and leakage prevention construction for deformation joints.
Comprehensive plan for permeable concrete:Implement the construction of permeable concrete to enhance the permeability of the ground.
Superior tile adhesion solution:Utilize superior adhesive materials for tile installation.

VIII.Port engineering scheme
Corrosion protection coating scheme for concrete at seaport terminals:Apply corrosion protection coating to the concrete at seaport terminals.
Silane impregnation anti-corrosion scheme for concrete structures in harbor engineering:Adopt silane impregnation technology to protect concrete structures in harbor engineering.
Reinforcement and strengthening scheme for underwater pier columns using fiberglass sleeves:Reinforce and strengthen the pier columns underwater using fiberglass sleeves.
Underwater concrete defect repair plan:Repair underwater concrete defects.

IX.Ground engineering plan
Treatment plan for sanding on concrete floor:addressing the issue of sanding on concrete floor.
Concrete floor damage repair plan:Repair the damaged parts of the concrete floor.
Construction plan for wear-resistant flooring:Implement the construction of wear-resistant flooring to enhance the wear resistance of the ground.
Self-leveling cement construction plan:Use self-leveling cement for floor leveling construction.
Epoxy resin flooring construction plan:Implement the construction of epoxy resin flooring to create an aesthetically pleasing and durable floor surface.
Concrete floor renovation and sealing curing plan:Renovate and perform sealing and curing treatment on the concrete floor.
Construction plan for oil-proof surface layer of building engineering ground:Construct an oil-proof surface layer to protect the building engineering ground.
Construction plan for non-sparking ground:Implement non-sparking ground construction to ensure ground safety.
Tel:0371-55915295
National Unified Service Hotline:400-617-8089
Lanling Huanke Industrial Park, Intersection of Chuangye Avenue and Chaoyang Road, Pingyu City, Zhumadian City, Henan Province
23F, Dewei Plaza, Kangning Street & Puji Road Intersection, Guancheng Hui District, Zhengzhou, Henan Province, China

QR code of official account